The timeline depends on scope, technical complexity, integrations, design needs, and the speed of feedback. A focused website or design engagement may take a few weeks, an MVP may take a few months, and a complex platform is usually delivered in longer phases. After discovery, we share a realistic plan with milestones, target dates, and dependencies.
02How is the cost of software development determined?
Cost is shaped by feature scope, user roles, number of platforms, integrations, data and security requirements, design depth, timeline, and post-launch support. If the scope is clear, we can provide a project-based estimate. If uncertainty is still high, we recommend discovery or a capacity-based model first, so the budget is tied to a prioritized plan rather than assumptions.
03How long does an API or system integration take?
The timeline depends on the number of systems, API documentation quality, data transformations, security requirements, and access to test environments. A focused integration between two well-documented systems may take a few weeks, while work involving several legacy systems, bidirectional data flows, or critical operations is usually delivered in phases. After discovery, we provide a realistic plan covering dependencies and production rollout.
04Can you integrate with systems that have no API or incomplete documentation?
In many cases, yes. We first evaluate available database access, file transfer, webhooks, message queues, or secure automation options. If there is no official API, we make the data-security, terms-of-use, and maintainability risks explicit and choose the most controlled connection method available instead of relying on fragile screen automation.
05How do you ensure privacy and data security?
We treat security as part of the architecture, not as a final checklist. Depending on the product, we plan data minimization, role-based access, encryption in transit and at rest, secure secret management, code review, logging, backups, and dependency updates. We clarify GDPR, KVKK, or organization-specific requirements at the start and limit access to only the people and systems that need it.
06Can you take over a project built by another team?
Yes. During technical discovery, we review the codebase, architecture, environments, access, tests, dependencies, release flow, and known issues. We then prepare a takeover plan covering critical risks, technical debt, missing documentation, and quick wins. Before feature work begins, our goal is to gain enough visibility to change the system safely.